Aspect Z Granny Flats "5-Step Process"

STEPPROCESS DESCRIPTIONCOST
STEP 1 EnquiryOwner makes initial inquiry to Aspect Z
Site size confirmed (Minimum 450m2)
Site frontage confirmed (Minimum 12m)
Aspect Z obtains Section 149 (2) Planning Certificate for site from council
Aspect Z obtains sewer and other service mains diagrams from DBUD
Standard design options provided by Aspect Z
Inclusions and exclusions provided by Aspect Z
Cost range of standard design options provided by Aspect Z
NIL
NIL
NIL
$133
NIL
NIL
NIL
NIL
STEP 2 SiteAspect Z consultant visits your site to discuss potential solutions
Complying Development Check carried out on specific site (Note 4)
Overall assessment of site suitability presented to owner by Aspect Z
Preliminary estimate for construction (subject to changes in Stage 3) provided
Design agreement presented to owner
Owner advises of intentions to proceed to Stage 3 or otherwise
NIL
NIL
NIL
NIL
NIL
NIL
Step 3 DesignDesign agreement signed off and design fee paid (Note 2)
Aspect Z organises detailed site survey plan
Any changes from standard design and inclusions confirmed with owner (Note 3)
Aspect Z prepares final architectural drawings
BASIX Certificate prepared (costs included in design fee)
Structural engineers drawings prepared (paid by owner)
Council or PCA fees obtained and provided to owner
Note 2
Surveyor Quote
Note 3
NIL
NIL
Engineers Quote
Fees by Owner
Step 4 ApprovalComplying Development Application lodged with council or PCA (Note 1)
Owner pays council fees for lodgment
Approval to construct obtained
NIL
Fees TBC
NIL
Step 5 ConstructionFinal tender cost submitted to owner
Construction contract signed between builder and owner
Aspect Z constructs granny flat under standard MBA lump sum or cost plus contract (to be decided by client)
Aspect Z provides handover to owner at completion
NIL
NIL
Contract Cost

Final Payment

NOTE 1:
The suitability for any granny flat to be submitted to council as part of a Complying Development Process (Guaranteed 10 day approval process) is determined in Stage 2.

If a Complying Development Application is not suitable for the site, a Development Application and Construction Certificate needs to be lodged.

Development Application and Construction Certificate Applications will be subject to an Aspect Z fee proposal to prepare additional council documentation

NOTE 2:
Costs for architectural plans are included in overall costs outlined in stage 2.

The amount is non refundable in the case of construction not proceeding or works not proceeding beyond Stage 3.
Costs for Design Fee: $2500 + GST for CDC Application of standard design. $3500 for Development Application of standard design. Prices on application for custom design.

NOTE 3:
Costs for architectural plans are included in overall costs paid in Stage 3.

Additional costs (Refer to hourly rates) are applicable only with changes from standard design of any particular granny flat model after the agreement has been signed.

NOTE 4:
Any additional site specific requirements will be notified at this point and can include the requirement for consultant input on the following:

Bushfire Management/Acid Sulphate soils/Flooding (including but not limited to). Costs for any of these additional consultant items are required to be met directly by the client.